Järviluoto, the expansion area of the Port of Rauma
+ Local plan in force (T/kem)
+ Robust electricity grid
+ Excellent infrastructure at the Port of Rauma
Approximately 20 hectares of land reserved for development by Luoto Energia Oy (a joint venture between Tree Energy Solutions (TES) and CPC Finland Oy).
- Planned annual production at the plant is approximately 60,000 tonnes of green hydrogen, which can be converted into over 125,000 tonnes of synthetic natural gas
- The plant’s electrical output is approximately 500 megawatts
A plot of approximately 16 hectares is available in Järviluoto.
Enquiries: Managing Director Janne Virta, Port of Rauma +358 (0)40 720 335